How to Use the MARSHINE Underground Cable Conveyor Cable Laying Machine?
The MARSHINE Underground Cable Conveyor Cable Laying Machine is a sophisticated piece of equipment designed to streamline the installation of underground cables for power, telecommunications, and fiber optics. Proper use of this machine ensures efficient cable deployment, minimizes labor costs, and reduces environmental disruption. Below is a comprehensive guide on how to operate the machine effectively, structured for clarity and practicality.
Pre-Operation Preparation
Before starting, ensure the machine and work environment are ready for safe and efficient operation:
A.Site Assessment
Survey the Terrain: Identify obstacles and mark the cable route using stakes or GPS tools.
Soil Analysis: Check soil type to adjust trenching depth and machine settings.
Environmental Compliance: Verify local regulations to avoid damaging protected areas or underground infrastructure.
B.Machine Setup
Inspect Components:
Check hydraulic hoses, bearings, and traction systems for wear or damage.
Ensure lubrication points are greased.
Attach Accessories:
Install the appropriate cable guide rollers and trenching blades based on cable diameter.
Connect optional accessories like GPS alignment modules or depth sensors.
Power On:
Start the engine and calibrate the hydraulic system to optimal pressure (refer to the manual for specifications).
Step-by-Step Operation Guide
Step 1: Configure Settings
Adjust Trench Depth: Use the hydraulic control panel to set the desired burial depth (typically 0.5–1.5 meters for power cables).
Select Cable Type: Configure the conveyor speed to match cable specifications.
Step 2: Load the Cable
Position the cable reel on the machine’s conveyor bed.
Thread the cable through the guide rollers and secure it to the traction mechanism.
Activate the tensioning system to prevent slack during laying.
Step 3: Begin Laying
Start the Conveyor: Engage the hydraulic drive to initiate cable movement.
Monitor Alignment: Use the real-time display to ensure the cable remains centered in the trench.
Control Speed: Maintain a steady speed (recommended 5–10 meters/minute) to avoid cable kinking or overstretching.
Step 4: Trench and Bury
The machine simultaneously digs a trench, lays the cable, and backfills soil.
For rocky terrain, activate the vibration reduction mode to minimize cable abrasion.
Step 5: Post-Laying Checks
Inspect the trench for consistent depth and coverage.
Use a cable locator to verify alignment and mark the route on maps.
Maintenance and Safety Protocols
A. Daily Maintenance
Clean debris from conveyor rollers and trenching blades.
Check hydraulic fluid levels and top up if necessary.
Inspect safety guards and emergency stop buttons.
B. Long-Term Care
Replace worn bearings every 500 operating hours.
Schedule annual hydraulic system overhauls.
Store the machine in a dry, covered area to prevent rust.
C. Safety Tips
Personal Protective Equipment (PPE): Wear gloves, steel-toe boots, and high-visibility clothing.
Avoid Overloading: Never exceed the machine’s maximum cable capacity.
Emergency Procedures: Familiarize yourself with the emergency stop button and fire extinguisher locations.
The MARSHINE Underground Cable Conveyor Cable Laying Machine revolutionizes underground cable installation by combining precision, power, and ease of use. By following this guide, operators can maximize efficiency, extend the machine’s lifespan, and ensure compliance with safety and environmental standards. Whether deploying cables in urban infrastructure or remote renewable energy sites, the MARSHINE machine is engineered to deliver exceptional results with minimal downtime.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies.
Privacy Policy