Our MARSHINE as a electric power tools manufacturer in China, have been offering the electricians and other utility workers with the durable yet efficient pole installation machine with the competitive price for more than ten years. And this MARSHINE Lifting Drill integrated Pole Erection Machine was a heavy-duty pole erection machine for the heavy poles, can help workers to deal with the drilling tasks and the heavy-duty lifting tasks with ease, so that to improve the working efficiency.
Been an efficient pole installation machine that designed for the power line construction and maintenance, the MARSHINE Lifting Drill integrated Pole Erection Machine which combines the drilling and lifting functions for pole installations in a single unit, this machine can streamlines the operations by reducing the need for the multiple pieces of equipment. It ensures the efficiency, safety, and the precision in setting poles for the electrical, telecom, and the utility projects, can be a good choice for your team.
Product Parameter
Model
MAPE-04
Drilling depth
0-6m
Drilling diameter
1m-2m
Standard dill pipe
300mmx3M, 600mmx3M
Lifting method
Full hydraulic
Standard drilling time
40s (diameter of 300mm-500mm)
Drill Head Material
Tungsten alloy
Auger Material
High-manganese carbon steel
Crane
3T/5T/8T crane
Tractor
Model 1004 BOMR tractor, 100HP, four wheel drive
Dimension
L5900*W2000*H2600mm
Weight
7.3t
Application
clay, pebble sand, weathered granite, tundra.
Not suitable for
Rocks, whole sand bed, household garbage and so on.
Operator needed
1 person
Product Feature
As a powerful yet reliable machine that with the high lifting capacity up to 3 tons, and the dual functionality which integrates the drilling and pole lifting ability into one machine for the higher efficiency, this MARSHINE Lifting Drill integrated Pole Erection Machine with the durable constructions that built with the robust materials is able to withstand the heavy-duty field applications, and can offer the users with the powerful drilling performance due to its equipped reliable drilling system, which offers the accurate and quick pole hole preparation. Its compact structure also allows the convenient movement and offer the users with the adaptability to the different terrains.
Product Application
This MARSHINE Lifting Drill integrated Pole Erection Machine is suitable for the construction works that requires the integrated drilling and lifting function, and the telecommunication pole setting and maintenance, or for the power transmission and the distribution in the line pole erection projects. In addition, it is suitable for the rural electrification and utility projects as well.
Product Details
The MARSHINE Lifting Drill integrated Pole Erection Machine is the reliable choice for the efficient yet reliable pole installation projects.
Origin:China.
Lead Time:10-12days.
Warranty:1year.
Certifications:ISO,CE.
Hot Tags: Lifting Drill integrated Pole Erection Machine
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies.
Privacy Policy